CRS Waterproofing, | Rydges South Bank, Brisbane
471
portfolio_page-template-default,single,single-portfolio_page,postid-471,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-theme-ver-13.9,qode-theme-bridge,disabled_footer_bottom,wpb-js-composer js-comp-ver-5.4.7,vc_responsive
 

Rydges South Bank, Brisbane

Built Constructions contracted CRS to install a duel waterproofing system of bitumen torch-on membrane, followed by a low VOC modified Acrylic for a full refurbishment of the hotel’s podium level with a new bar, restaurant, pool, pool deck and function rooms. All works were undertaken during hotel operations. CRS developed a system to work in conjunction with the buildings construction joint and pool chemical rooms.

Category
CRS